Distribution Voltage Capacitor Switching Studies

Manitoba Hydro (Canada)
AC System Studies

This project was to support the energization of over 30 capacitor banks at different locations on the Manitoba Hydro 11 kV network. In addition to identifying the inrush/outrush reactor requirements, the study also investigated network resonance possibilities due to capacitor bank switching.