Multiple Run ‘Skip’

When working with large simulations and multiple run scenarios, errors can be time consuming and costly. In the past we have been asked for the capability to execute a ‘dry’ simulation whereby the user can quickly check to make sure the configuration of each run is valid. Unfortunately, there was no way to run only a partial and then skip to the next run in the sequence.

A new button, called ‘Skip’, has been added to the ribbon, which sends a message to EMTDC instructing it to jump to the end of the run and begin the next one. In the case of simulation sets and master/slave batch configurations (including volley), the entire coordinated run will skip to the next iteration.

Back