Simulation Sets and Multiple Simulations

It is now possible to simultaneously launch and run multiple EMTDC™ simulations. Both sequential and parallel simulation runs are possible by defining what are referred to as ‘simulation sets’ in the workspace.

Projects loaded under the Projects branch in the workspace may be added as a Simulation to a Simulation Set. All simulations in a particular set will be launched simultaneously, utilizing all processor resources available. Each set is run sequentially: In other words, set 1 will run all projects that are defined in it then set 2 will run and so on.

Control for multi-EMTDC can be found in both the Simulations right-click pop-up menus, as well as on the Run button in the ribbon.

Back